MISRAPavement Intelligence
Public preview

DATA TO DURABLE DECISIONS

Model roads. Predict response. Prevent failure.

Integrate location, materials, laboratory evidence, climate, traffic and live sensors to design and maintain longer-lasting roads.

SAFER ROADS
STRONGER COMMUNITIES
BRIGHTER TOMORROWS
Pavement Equilibrium0.87● Stable
Remaining Life12.6 years● On track
Pothole Horizon2.4 km● Watch list
Deflection (D₀)286 μm● Normal
MDAI Damage0.32● Low

Road Network & Sensor Status

NH-2742 sensors · 3 alerts

Pavement Cross-section

40 mm Asphalt surface
60 mm Binder course
200 mm Base
250 mm Subbase
Subgrade

Condition Forecast

Surface Temperature34.2 °C
Moisture Content4.8%
Traffic Load18,600/day
Climate28 °C · 62% RH

AHP–TOPSIS Maintenance Ranking

RankRoad sectionPriorityRecommended action
1NH-27 (42–56 km)0.92Major rehabilitation
2SH-18 (10–24 km)0.78Overlay + strengthening
3NH-27 (78–92 km)0.71Preventive maintenance

PAVEMENT DESIGN

Project & Location

Define the corridor and generate 20 m engineering chainages.

Autosave● Ready

Project identity

Chainage definition

Calculations are generated at every 20 m peg, consolidated per kilometre and for the full corridor.
1.00 km corridor · 51 pegs

Horizontal and vertical geometry

Drainage geometry

Traffic demand

Calculated loading

Daily equivalent axles—
Design-lane loading—
Traffic class—

Climate and energy

Hydrology and moisture

Layer structure

LayerMaterialThickness (mm)Modulus (MPa)Poisson ratio
Surface
Base
Subbase
Subgrade

Mix design method

Volumetrics

Mechanical response

Structural limits

Durability limits

Reference framework

Model configuration

    Predicted outcome

    PEI—
    MDAI—
    RUL—
    Verification—

    LIVE PAVEMENT ANALYSIS

    Coupled response and deterioration

    Monitor chainage-level energy, moisture, strain, deflection and damage.

    ● LIVE

    Live Network & Sensor Map

    Selected S04 · CH 12+40038.5 °C · 4.2% moisture · 82 με

    Key Performance Indicators

    PEI—
    MDAI—
    RUL—
    Deflection—
    Rut depth—
    Pothole risk—

    Real-time Telemetry

    Surface Energy Balance

    Q* = (1−α)S + L↓ − εσTₛ⁴
    Net radiation—
    Stored heat—
    Wetting front—

    Failure Models

    ModeProbabilityTrendForecast

    Scenario Stress Test

    ScenarioPEIRULRisk

    LABORATORY

    Evidence, rheology and mix verification

    Capture traceable test results and qualify pavement materials.

    Binder Rheology & Ageing

    PropertyResultRequirementStatus
    Penetration (25 °C)6250–70●
    Softening point48 °C≥ 46 °C●
    Viscosity (135 °C)0.620.3–3.0 Pa·s●
    RTFO mass loss0.32%≤ 1.0%●
    PAV ageing loss2.1%≤ 2.5%●

    ΔTc & MSCR

    CriticalWarningAcceptable

    Mix Volumetrics

    Binder content5.2%
    Air voids4.1%
    VMA15.8%
    VFA74%
    Compaction99.2%

    Mechanical Performance

    TestResultRequirement
    ITS980 kPa≥ 700
    TSR0.88≥ 0.80
    HWTT rut depth9.2 mm≤ 12.5
    Dynamic modulus7,200 MPa≥ 2,500
    Resilient modulus520 MPa≥ 300

    SATS 3208 / Durability

    Initial stiffness1,250 MPa
    Retained stiffness0.82
    Retained saturation strength0.87
    Visual stripping1.0 / 5
    ✓ SATS 3208 · Pass

    Traceability & Verification

    ✓ SANAS laboratory✓ Equipment calibration✓ Chain of custody✓ Sample / batch ID✓ Test date and method✓ Reviewer approval
    Compliance confidence96%

    SENSORS & GIS

    Georeferenced road intelligence

    Link embedded MISRA sensors, survey pegs, weather and condition evidence.

    Corridor Sensor Map

    20 m design pegs · 250 m sensor planWeather and traffic stations linked by coordinate

    Deployment Plan

    Road length1.00 km
    Minimum sensor nodes5
    Longitudinal spacing250 m nominal
    Acquisition interval15 minutes
    ReportingDaily exception · weekly summary
    Minimum three MISRA glass-block sensors per monitored section. Failed units are logically replaced without excavation until rehabilitation.

    Sensor Registry

    IDChainageCoordinatesTemperatureMoistureStrainSignalStatus

    CHAINAGE-BASED MAINTENANCE

    Diagnose, restore and extend pavement life

    Combine RUL, distress, DCP, CBR, density and recovered-binder chemistry at every 20 m peg.

    Condition evidence

    Layer verification

    Recovered binder & RAP

    RAP Compatibility Diagnosis

    Restoration demand = target fraction − recovered fraction
    SARA proportions are screening indicators. Final dosage requires recovered-binder blending, rheology, ageing and performance verification.

    Emulsion / Rejuvenator Sequence

      Recommended Treatment

      Predicted life extension—
      Indicative cost band—
      Decision confidence—

      20 m Chainage Maintenance Schedule

      ChainageRULDCPCBRDensityDiagnosisRAP chemistry responseMaintenance actionLife extensionPriority

      SEMANTIC REASONING

      Explainable engineering rules

      Every recommendation is linked to evidence, thresholds and a professional review gate.

      VERIFICATION GATES

      Controlled release of engineering decisions

      Progress only when evidence, calibration, compliance and approval requirements are satisfied.

      1

      Data completeness

      Location, chainages, structure, traffic, climate and material traceability.

      Passed
      2

      Laboratory qualification

      Volumetrics, rheology, moisture durability, stiffness and deformation resistance.

      Passed
      3

      Model calibration

      Physical constraints, sensor evidence, drift and uncertainty review.

      Review
      4

      Professional approval

      Registered engineer acceptance and agency release.

      Pending

      PROGRAMME BACK OFFICE

      Portfolio, people, approvals and reporting

      Controlled governance across agencies, provinces, municipalities and road zones.

      Managed Road Sections1,842
      Network Length42,580 km
      Active Engineers186
      Open Projects64
      Critical Alerts12
      Pending Approvals28
      Data Completeness96%

      Geographic Portfolio

      National road portfolioAgency · Province · Metro · Municipality · Zone

      Road Portfolio

      RouteSectionRegionPEIRULRiskEngineer
      N10+000–50+000Gauteng4.212MediumT. Mokoena
      N3120+000–170+000KZN3.18HighS. Dlamini
      R610+000–45+000Eastern Cape3.910MediumA. Jacobs
      R5730+000–20+000Limpopo2.67HighM. Lebese

      Alerts & Escalations

      • Extreme heatN1 25+300 · Level 2
      • Moisture ingressN3 142+500 · Level 1
      • Sensor driftR24 5+600 · Review
      • Pothole precursorR61 12+900 · Level 1

      Approval Workflow

      Design submittedTechnical reviewCompliance gateProfessional approvalAgency release

      Budget & Maintenance

      PlannedR12.8B
      CommittedR6.4B
      ForecastR18.6B

      Engineer access

      Sign in to edit, save, approve and export controlled records.